date icon 31 AUG 2021
Case Studies

FASP Turbine

The FASP phase of the Solar Turbine upgrades and 11/33KV distribution modifications were executed safely and to schedule, ultimately delivering the key project objectives of maximising use of Aviat Gas to provide additional power generation to the Forties Ring Main, and therefore enabling reduction in power generation using diesel fuel, and reduction of CO2 emissions within the Forties field.