Delta V Upgrades

Global E&C replaced the existing 30 year old Honeywell Distributed Control system and Schuh Safe Instrumented system with a new Emmerson Delta V system and SIS. Global E&C created a new Delta V equipment room and installed new field marshalling boxes, cable infrastructure and new field cabling. Global E&C replaced existing field instruments with modern equipment a d integrated existing packaged systems. (Fire and Gas and Generation PLC) into the new Delta V ICSS. Global E&C multi-skilled team also de-constructed the redundant system.